Sandiway Primary School

Enabling works, substructure & external works

Client: ISG Construction
Completed: ongoing
Value: £82,099
Duration: 12 weeks




Initial enabling works required forming site entrance using section50 notification to local authority.

Earthworks operations completed to reduce level dig and then placement of capping and subbase. Drainage installation for localised surface water and foul pop ups to new build extension.

Foundations comprised of deep strip footings / pads with holding down bolts cast insitu to allow follow on steelwork contractor,

Return to site to cast reinforced concrete floor which was pumped during weekend hours to minimise disruption at site access gates throughout normal school day.