C128 - Carrwood, Hale Barns

Substructure works & external paving

Client: Paragon Construction Group
Completed: ongoing
Value: £220,000
Duration: TBC




Initial package was to carry out structural strengthening to existing basement swimming pool extension. Following successful completion of this – hollowrib deck was installed and insitu reinforced concrete roof slab.

A new drainage scheme was required for both foul and surface water systems with removal of existing redundnat drains.

Extensions to existing property required pile caps and ground beams in addition to structural foundation slab.